Our works

Central facade and balcony restoration and renovation works on site ‘’Veselības un medicīnas centra pārbūve’’

Address: Baznīcas iela 18a, Rīga

Work ends: 10.2019

Residential building brick facade construction

Address: Drottinggatan 44, Linkoping, Sweden

Premises finishing works

Address: Ata Kronvalda ielā 7, Siguldā

1st stage – New building of Sigulda State Gymnasium study block

Reconstruction and construction of residential buildings

Address: Kuģu Street 15

The customer is SIA KUĢINIEKS, design institution – SIA Sarma & Norde Architects, a project called “’Rezidences Kuģinieks” is planned in this place.

Built in 1889, the building has received a new breath by architect Reinhold George Schmeling, where the historic building is harmoniously combined with a modern new building.

Facade restoration work was carried out by SIA Hisdroterm Latvia. Work was done in 2018

Works on the restoration of brick walls:

1. Brick masonry reseaming with lime mortar Caparol Mitau Putz
2. Reconstruction and restoration of profiled tile and plastic decor with lime based mortar.
3. Loss of brick and concrete tiles prosthetics Histolith Restauriermörte
4. Tinting repaired brick areas with Histolith Voltonfarbe Natural Pigments
5. Silicate paint for concrete tile and cornices with Sylitol-Finish

Ernests Vigners Music School of Kuldiga

Address: Smilšu 6, Kuldiga, Kuldiga City, LV-3301

Performed works:
Restoration of historic brick facade.
Interior finishing works.

Work period: 01.06.2016-15.02.2017.

Rīga Stradiņš University Anatomy Building

Address: Kronvalda Boulevard 9, Riga

Performed works:
Cleaning of the historic brick facade with a gentle method and masonry restoration at the entrance node.
Restoration of ceramic decorations.

Work period: October 2016 to March 2017

Riga 1st Hospital fence

Address: Bruņinieku Street 5, Riga

Performed works:
Cleaning of the historical brick fence by a gentle method
Gentle dismantling and reassembly of stakes after fixing the foundation
Restoration of masonry
Reconstruction of joints
Tile reconstruction

Work period: October 2016 to May 2017